Site Logo
My Account | Wishlist | Basket
All Categories

Video Cables & Connectors

Latest Articles
Choosing a New Television
Are More Expensive HDMI Cables Worth It?
  1. Home
  2. Video Cables & Connectors
Product Image

USB Type C Charging Cable For Apple iPhone 15 Pro Max Plus Long Lead UK

£4.59

Standard charging cables only provide the standard charging speed. iPhone 15 | iPhone 15 Plus | iPhone 15 Pro | iPhone 15 Pro Max | Samsung | HuaWei | XiaoMi and many phones that use the Type C interface.

Product Reviews

Name: Review:

Related Products

[20W] Samsung Tablet Fast Charger for Samsung Galaxy Tab A11/A11 Plus, S11, S10/S10 FE/, S9/S8/S7/S6, A9 Plus/A9/A8/A7/A7 Lite, Ultra USB Type C Charging Cable [2M], UK 3 Pin Mains wall Charger Plug

[20W] Samsung Tablet Fast Charger for Samsung Galaxy Tab A11/A11 Plus, S11, S10/S10 FE/, S9/S8/S7/S6, A9 Plus/A9/A8/A7/A7 Lite, Ultra USB Type C Charging Cable [2M], UK 3 Pin Mains wall Charger Plug

£9.99

USB Type C Charging Cable 1m 2m 3m for PS5 Xbox Series S X Game Controller

USB Type C Charging Cable 1m 2m 3m for PS5 Xbox Series S X Game Controller

£2.87

Pack of 2 USB C to USB C Cable 60W 1.5M Fast Charging Type C Charger Cable | USB C to USB C Charger | Type C to Type C Charging Cable | Phone Charger Cable | USB C Fast Charge Cord for Android & More

Pack of 2 USB C to USB C Cable 60W 1.5M Fast Charging Type C Charger Cable | USB C to USB C Charger | Type C to Type C Charging Cable | Phone Charger Cable | USB C Fast Charge Cord for Android & More

£2.99

AUFU USB C Charger Cable 3Pack (3ft 6.6ft 6.6ft), 180 Degree USB Type C Charger Fast Charging USB A to USB C Cable, 3A Right Angle USB C Charger Cable for Type C Devices

AUFU USB C Charger Cable 3Pack (3ft 6.6ft 6.6ft), 180 Degree USB Type C Charger Fast Charging USB A to USB C Cable, 3A Right Angle USB C Charger Cable for Type C Devices

£12.99

USB C to USB C Charger Cable for iPhone 15/16/17 Fast Charging, 60W Type C Charging Fast Charging Cable for iPhone17/16/15 Pro Max, iPad Pro/Air/Mini, Samsung, Pixel (Pink, 2M, 2PCS)

USB C to USB C Charger Cable for iPhone 15/16/17 Fast Charging, 60W Type C Charging Fast Charging Cable for iPhone17/16/15 Pro Max, iPad Pro/Air/Mini, Samsung, Pixel (Pink, 2M, 2PCS)

£6.79

USB C to USB C Charger Cable,3M Long i Phone Type C Charging Lead 2Pack Fast Charging Wire USBC Charger Cables for iPhone 17 Pro Max/17 Air/16/16 e/16 Pro/15 Plus, iPad Pro/Air/Mini,Mac

USB C to USB C Charger Cable,3M Long i Phone Type C Charging Lead 2Pack Fast Charging Wire USBC Charger Cables for iPhone 17 Pro Max/17 Air/16/16 e/16 Pro/15 Plus, iPad Pro/Air/Mini,Mac

£8.99

Privacy Policy

All third-party product, company names and logos are trademarks™ or registered® trademarks and remain the property of their respective holders. Use of them does not imply any affiliation with or endorsement by them. All references to third party trademarks are intended to constitute nominative fair use under applicable trademark laws.

Content is provided ‘as is’ and is subject to change or removal at any time.

© buyTVs.uk 2026