Site Logo
My Account | Wishlist | Basket
All Categories

Video Cables & Connectors

Latest Articles
Choosing a New Television
Are More Expensive HDMI Cables Worth It?
  1. Home
  2. Video Cables & Connectors
Product Image

4K HDMI Cable 2.0 Ultra HD High Speed 1m/2m/3m/5m/7m/10m/15m/20m Metre Long Lead

£34.99

4K HDMI Cable (1m–30m) • HDMI 2.0 High Speed. ???? HDMI 2.0. HDMI Standard HDMI 2.0. Lengths 1m–30m (select your length from the dropdown). Connectors HDMI Type-A Male to Male. HDR • ARC • Gold Plated • Premium Build • 3 Year Warranty.

Product Reviews

Name: Review:

Related Products

PowerBear HDMI Cable 20 ft HDMI 2.0 4K UHD Gold Plated Shielded Black

PowerBear HDMI Cable 20 ft HDMI 2.0 4K UHD Gold Plated Shielded Black

£8.65

USB C to HDMI Cable 20 Ft, 4K@60Hz HDR, Gold-Plated Braided High-Speed USB 3.1 T

USB C to HDMI Cable 20 Ft, 4K@60Hz HDR, Gold-Plated Braided High-Speed USB 3.1 T

£40.58

USB C to HDMI Cable 20 Ft, 4K@60Hz HDR, Gold-Plated Braided High-Speed USB 3.1 T

USB C to HDMI Cable 20 Ft, 4K@60Hz HDR, Gold-Plated Braided High-Speed USB 3.1 T

£40.26

StarTech.com 6in (15cm) HDMI Extension Cable - Short HDMI Cable Male to Female - 4K HDMI Cable Extender - 4K 30Hz UHD HDMI Port Saver M/F - High Speed HDMI 1.4 - 30AWG - HDMI Dongle Extender

StarTech.com 6in (15cm) HDMI Extension Cable - Short HDMI Cable Male to Female - 4K HDMI Cable Extender - 4K 30Hz UHD HDMI Port Saver M/F - High Speed HDMI 1.4 - 30AWG - HDMI Dongle Extender

£17.99

KabelDirekt – 8K / 4K HDMI Cable – 2x 2m & More HDMI Cables (0.15m–22.5m) – German-Engineered HDMI Lead – Supports 10K/8K@60Hz/4K@120Hz – HDMI Cable for HDTV, PC, PS5, Xbox, Switch

KabelDirekt – 8K / 4K HDMI Cable – 2x 2m & More HDMI Cables (0.15m–22.5m) – German-Engineered HDMI Lead – Supports 10K/8K@60Hz/4K@120Hz – HDMI Cable for HDTV, PC, PS5, Xbox, Switch

£8.32

KabelDirekt – 8K / 4K HDMI Cable – 5x 2m & More HDMI Cables (0.15m–22.5m) – German-Engineered HDMI Lead – Supports 10K/8K@60Hz/4K@120Hz – HDMI Cable for HDTV, PC, PS5, Xbox, Switch

KabelDirekt – 8K / 4K HDMI Cable – 5x 2m & More HDMI Cables (0.15m–22.5m) – German-Engineered HDMI Lead – Supports 10K/8K@60Hz/4K@120Hz – HDMI Cable for HDTV, PC, PS5, Xbox, Switch

£20.32

Privacy Policy

All third-party product, company names and logos are trademarks™ or registered® trademarks and remain the property of their respective holders. Use of them does not imply any affiliation with or endorsement by them. All references to third party trademarks are intended to constitute nominative fair use under applicable trademark laws.

Content is provided ‘as is’ and is subject to change or removal at any time.

© buyTVs.uk 2026